GEORGE NEWS - The Cradock / Market Street intersection will be reconstructed in 2 phases. During the first phase (indicated in yellow in the diagram below), commencing on 21 May 2022, the section of Market Street between Meade Street and Cradock Street will be closed to through traffic to and from Meade Street, as indicated in the figure.
During the second phase (indicated in red), commencing approximately 1 June 2022, the section of Market Street between Mitchell Street and Cradock Street will be closed through traffic to and from Mitchell Street.
During the entire intersection reconstruction period, traffic flow in the Cradock/ Market Street intersection will be maintained utilizing the traffic lights as a control for a 3-way intersection.
As there will be limited turning space access may be limited for large delivery vehicles, and no access will be permissible for interlinks.
Extra care is to be taken by road users and pedestrians throughout the duration of the construction period.
Adherence to temporary road signage and markings will be required.
Project enquiries:
Consulting Engineers: Charles Rowe and Associates (Phone: 044 884 0209)
Public Liaison Officer: Thousand Sensations: Alewijn Dippenaar: email: dyndev@mweb.co.za Phone: 082 457 5675
PREVIOUS ARTICLE: Market Street upgrade: 7 more months
'We bring you the latest George, Garden Route news'