GEORGE NEWSFLASH - The Eskom power system is severely constrained.
Should we experience further technical problems and the loss of an additional 1200 MW, a load reduction is likely to be required.
If Eskom declares stage 1 then George will not be affected.
'We bring you the latest George, Garden Route news'